Pre-feed and FEED Services for Red Sea LNG Terminal Project

Sector
Natural Gas
Starting Date
Apr 16
Scope of Work
PMC Services for Pre-feed and FEED Services
Location
Sudan
Completation Date
Aug 17
Client
SUDAN NATURAL GAS COMPANY (SUNAGAS)

Description

Pre-FEED & FEED of Onshore Red Sea LNG Terminal, which aim to feed the gas to Port Sudan Power Plant and to a pipeline leading to Kosti.
The Terminal consists of:

  •  2 Full Containment Storage Tanks (up to 4 in subsequent phases)
  • 1 jetty with unloading facilities (2 jetties in subsequent phases)
  • Regasification facilities
  •  Truck loading bays
  • Metering station at the battery limit with the pipeline